Saturday, November 23, 2024
37.0°F
Drawing courtesy of ITD
This drawing depicts the containment system that will be built to catch any oil leaking from sunken equipment at Higgens Point.

Stories this photo appears in:

Plan eyes leaking dozer at Higgens Point
February 25, 2023 1:06 a.m.

Plan eyes leaking dozer at Higgens Point

Steel containment system expected to be constructed by this summer

Once designed the hood, 40-feet wide and 40-feet long, will be built on the shore of the lake and could be in place as early as June.