Friday, January 10, 2025
30.0°F

Study to be completed on old Wallace school building

by JOSH McDONALD
Staff Writer | January 10, 2025 1:00 AM

WALLACE — For years, the Wallace School District has been exploring options related to the old Wallace High School building and now, a determination on the building’s fate may be on the horizon.  

According to Wallace School District Superintendent Todd Howard, the district is working with the Idaho Department of Environmental Quality to secure funding for a hazardous material evaluation to be completed on the building, as well as potentially demolishing the building’s east academic wing.  

The building’s west academic wing was demolished during the construction of the new Wallace Jr./Sr. High School, which opened in 2003.  

The building’s gymnasium, now known as the Civic Auditorium, has a longstanding history within the Silver Valley community, along with being on the National Register of Historic Places. Over the years, the building’s maintenance was neglected, which has led to water damage, mold and other major issues.  

“The hazardous material (evaluation) requires material sampling from all building materials, some electrical, asbestos, exposed dirt and fill material,” Howard said. “Those samples are then sent to a lab for analysis.” 

The conditions of the building as well as the materials used in its construction present additional health risks if the building remains standing or is demolished.  

The Civic Auditorium would certainly be among the larger gathering places if it were to be renovated, capable of holding about 3,000 people. The space potentially created by demolishing the east wing could become an outdoor public area.  

“Ultimately the board’s wish is to have the building or property revitalized into a usable space,” Howard said. “Their first choice would be to renovate the Civic Auditorium. If that were not financially possible, then an open space area like a park. The intent of the board would be to transfer the responsibility of the facility to a second party through a lease or other arrangement.”  

In early 2023, Howard had some experts visit the Civic Auditorium and in its current state, just to be remodeled and brought up to code, cost was estimated at $5.4 million.

The district hopes to have the hazardous materials evaluation completed by the early spring.