Buildings, burgers and bits
The Mill commercial-residential buildings underway
Three combination commercial-residential buildings are under construction in Coeur d'Alene.
The four-story place called The Mill is on the west side of Government Way between Mill and Davidson avenues. It will have five retail or restaurant places and a lobby on the first floor and 43 apartments in the floors above.
Owner is Widmyer Corp. with design by Momentum Architecture. Completion is planned for April 2023. Check widmyercorp.com.
Midtown Centre is on Fourth Street
Two buildings are planned, and the one to the north is being constructed at 821 N. Fourth St.
Two commercial spaces will be on the first floor with 16 upscale apartments on floors 2 and 3. The apartments will have floor-to-ceiling windows, private decks and a large open lawn fronting Fourth Street.
Owner is Midtown Ventures with Eric Hedlund Design for architecture and John Beutler of Century 21 as commercial realtor. It should be complete in 10 months.
CornerStone offers mixed uses, parking
With commercial spaces on the ground floor, 15 living units on the upper three floors and underground parking, the CornerStone should be complete by late summer.
Located at 1579 W. Riverstone Drive, across from Red Robin, office spaces will be on the first floor, six condo units on the second and third floors and three penthouses (with Riverstone Pond views) on the fourth floor.
Riverstone Holdings is the owner, Ginno Construction the builder and Architects West the designer. For office space contact Casey Brazil at 208-770-2590 and for condos call Nicole Cummings at 208-664-9955.
Schmidty's Burgers opens on Sherman
Opening at 1524 E. Sherman Ave., after being blasted by the big fire downtown two years ago, Schmidty's Burgers offers fresh food and friendly service.
With seating for 45 customers, owners Nate and Denise Schmidt offer a variety of burgers, fries, onion rings, sweet potato fries, salads, chicken drumsticks (slow-baked and deep-fried) and beverages (beer and wine soon).
Hours are 11 a.m. to 8 p.m. Tuesday through Thursday, 11 to 9 Friday-Saturday and 11 to 3 Sundays. Helpers are Seth Schmidt, Caleb Schmidt and Hailey Reuter. Phone 208-292-4545 for take-out orders.
Now the Tidbits
- Businesses to be in the new Lucille Building at 2605 N. Fourth St. are Northwest Construction Management, Align Yoga Studio, Refined Salon, Heirloom and Stylus Wine & Vinyl Bar.
- A spy says the downtown Wells Fargo building has sold.
- Watch for The Manna Shop at 510 Sherman Ave., (the former Christmas At the Lake place).
- Post Falls RV Campground is under construction at 70 W. Cabelas Way between the Cabela's store and State Line Walmart in The Pointe at Post Falls.
- The Party 101 store in Prairie Shopping Center will close at the end of April.
- Many of 16 lots are available in the planned Prairie Crossing Shopping Center in the northeast corner of Highway 41 and Prairie Avenue.
- A burger place and cosmetic salon will be in the new building at Fourth and Lakeside.
- A new building for Etco Services is under construction off Huetter north of Seltice and I-90
- The PACR office building is under construction at 1857 W. Hayden Ave.
- Breaking Bread Bistro will be where Davis Donuts was at Fourth and Best.
- The former Shopko building will be a new location for Tri-State Outfitters inventory.
- A sign on Wayne Drive in Hayden says "Future home of Blue Chip Chiropractic."
- Open Arms Real Choices Clinic will move from 1800 Lincoln Way to 8056 N. Wayne in Hayden.
- Metro Express Car Wash is building a large new place in the northwest corner of Highway 41 and I-90.
- Consign Furniture has a "coming soon" sign southwest of the U.S. 95-Lancaster Road intersection..
- An Express Exterior Carwash is being built in the 3400 block of Seltice in Post Falls.
- Major changes are coming to the Greenbriar Inn & 315 Cuisine under new ownership at 315 Wallace Ave.
- The Rebel Junk Shoppe at 2424 N. Fourth St. will expand to a street-side location.
- Bruchi's quick service restaurant is planned for a new building north of the corner of Highway 41 and Mullan Avenue.
- The former Ugly Fish restaurant building will be a Berkshire Hathaway Realty in Riverstone.
- Watch for construction of Vantage Point Brewery across from Michael D's Eatery off Coeur d'Alene Lake Drive.
- A Sweet Lou's restaurant, a Dollar General store and a Grease Monkey auto place will be at the Crossings in Athol.
- CdA Kids Dental will be at 1341 N. Northwood Center Ct.
- TownePlace Suites by Marriott Hotel is being built where the Outback Steakhouse was in the southeast corner of I-90 and Northwest Boulevard.
- Several steel storage buildings will be built at 3758 W. Hanley Ave. (off Atlas Road) for Hern Ironworks.
- A Capriotti's Sandwich Shop will come into the former Chipotle Mexican Grill building at 305 W. Appleway.
- A Sarah Hamilton FACE place will be at 2120 Northwest Blvd.
- Watch for major changes with the Burger Bunker and Bunker Bar off Spokane Street in Post Falls.
- The Garnet breakfast place in midtown is moving to the former Broken Egg building on Government Way.
- A new gas station-convenience store opens soon in the northeast corner of Atlas at Seltice.
- A large storage complex and new corporate office for Steel Structures of America is being built off Highway 41.
- The Den will be a new tavern at 761 N. Idaho St. in Post Falls.
- My Nails & Spa will be off Canfield Avenue.
- The CD'A Corner Store is adding a kitchen and tables downtown.
- Watch for news of Willamette Valley Bank in the 325 E. Sherman Ave., building.
- Coeur d'Alene Nissan will have a major addition to its building off U.S. 95.
- Mountain Goat Lounge is under construction connected to the Moose Lounge downtown.
- The Post Falls Pavillion food truck court will be near the Highway 41 and Horsehaven intersection.
- Trader Joe's evidently has no plans for a North Idaho place yet.
- Contact Nils Rosdahl at nrosdahl@cdapress.com