One Lakeside condo building eyes July completion date
A July completion is now estimated for the 15-story One Lakeside luxury condominium building under construction at First Street and Lakeside Avenue.
The place is more than 40 condominiums with views of Lake Coeur d’Alene and downtown. The fourth, fifth and sixth floors have 29 short-term (hotel) rooms. The suites have full kitchens with appliances and quartz countertops, one and two-bedroom floor plans and balconies with the view.
Guests will have options to use the amenities of a fitness center, a fourth-level outdoor park and dog run and a rooftop club room with a kitchen, billiard table, televisions and the panoramic view from covered and open spaces.
A 105-lot garage is on the first three levels, and a 1,400-square-foot upscale convenience store will be on the ground floor.
Units are listed through the Century 21 team of Sandi Bloem, Kurt Lundblad and Mark Parisot. Phone 208-765-5554. Check www.onelakeside.com.
Summit Mold plans second building in Post Falls
A second building for manufacturing will be built on the 2 acres Summit Mold has at 4300 W. Seltice Way on the west side of Post Falls.
The company uses robotics to build small parts to make stack, multi-shot, unwind, two-shot, over-mold, plastic-injection and prototype molds. Many are for medical supplies, including ventilators.
Now with 18 employees, Summit Mold began in 1997 and has steadily grown with Ron Finnicum as president. Hours are 6 a.m. to 5 p.m. weekdays. Phone 208-777-7462. Check www.summitmold.com.
Bay Street Storage growing to 75 units
Primarily adding larger units for boats, RVs and more, Bay Street Storage is adding a 41,000-square-foot expansion at 355 N. Bay St. (1011 E. 3rd Ave.) in Post Falls.
The 75 unit sizes are at 14x45, 12x30, 14x40 and 14x45 and roof-only covered storage. Construction is by Steel Structures of America of Post Falls.
Completion will be this summer with the complex open 5 a.m. to 10 p.m. daily with an automatic gate, cameras and alarms. Bay Street Storage office hours are 9 a.m. to 5 p.m. weekdays and 9 a.m. to 3 p.m. Saturday and Sunday. Phone 208-773-3396. Check www.baystreetstorage.net.
This story is real artistry
This guy stole some valuable paintings by getting past security and into his van with them. But he was captured only two blocks away when his van ran out of gas.
When asked how he could make such an obvious error, he replied, “Monsieur, that is the reason I stole the paintings. I had no Monet to buy Degas to make the Van Gogh.”
See if you have De Gaulle to send this on to someone else. I wrote it because I had nothing Toulouse.
And now the Tidbits
• The Roger’s Ice Cream & Burgers on Neider Avenue closes today. A new one is being built on Government Way, south of the Wells Fargo on Appleway.
• A new Chase Bank will be built in front of Tractor Supply on Neider.
• Atlas Building Group will have a new office in Riverstone.
• P1FCU, Auto Zone and a gas station-convenience store are all coming into Athol.
• Green Mountain Construction in late May will have its administrative office at 1026 N. Fourth (being remodeled).
• Watch for a new eatery where San Francisco Sourdough was downtown.
• Solder & Stone Jewelry is moving in Hayden.
• A new commercial building is under construction at 6040 Government Way.
• Northwest Softplay is “coming soon” at 317 E. Seltice.
• 108 North is under construction connected to the Moose Lounge downtown.
• A “Coming Soon” sign is with an “India House” sign at 740 N. Cecil Road in Post Falls.
• Watch for Sherman Food Court coming at 1902 E. Sherman Ave.
• Something new is going into 413 Sherman beside the Art Spirit Gallery.
• Alpine Animal Hospital (now on Best Avenue) is building a new place on Kathleen west of Mango Tree.
• A Lunchbox Wax, Union Coffee Roasters, Stretch Lab, Pokeworks and Mangia Wood-Fired Pizza will be in The Northern complex northwest of the Ramsey Road-Hanley Avenue intersection.
• Trademark Mechanical is building a new place in Hayden.
• The new Bakery by the Lake will be on Coeur d’Alene Lake Drive.
• Lean Kitchen will be at 2632 Government Way.
• A Burger King is under construction at 3827 N. Ramsey (just south of Kathleen).
• A new Carl’s Jr. is under construction in the former Burger King location on Appleway.
• A Stillano Gelato shop will be at 217 Sherman.
• The new Hardwick Hardware is under construction at 3820 E. Mullan in Post Falls.
• A new place on the corner of Government Way and Lancaster will be a Golden Glo Coffee Shop.
• CdA Acupuncture & Holistic Healing is opening at 810 Sherman Ave.
• Something new is coming into 1621 Sherman.
• A Bluegrass clubhouse will be built at 1586 W. Switchgrass Lane. Where is that?
• It’s possible to lead a cow upstairs, but not downstairs. Why would you lead a cow upstairs?
• Contact Nils Rosdahl at nrosdahl@cdapress.com